Powered By Kitlog Pro v2.0
Aviation Graphics
RV-12
All
8-27-2014
< Previous Log Entry
Next Log Entry >
Date:
8-27-2014
Number of Hours:
12.00
Manual Reference:
Brief Description:
Wiring Harness Installation
Continued installing wiring throughout the Fuselage.
Installed and tested the Wing Pint locking indicator Reed Switches.
Installed the Push-to-Talk buttions and wiring on the control sticks.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-12 Home
Category
# Logs
# Hours
All
43
709
Avionics
2
30
Empennage
11
258
Finishing/Painting
1
30
Fuselage
19
203
Miscellaneous
3
150
Preparation
4
18
Tools
3
20
Copyright © 2001-2024 Matronics. All Rights Reserved.