Worked on elevator fit and finish today. Adjusted the connector link lengths so that the pivot points are correct. I also added rivets to the Leading edges so that edge is pulled down the entire length of the elevators. I also redid some rivets on the left wing along the inner spar that I was not happy with.
Using my rivet fan to space out the additional rivets.
Elevator end caps fit and ready for rivets.
Replaced about 20 rivets along the TE of the Left wing.