KitLog pro

Powered By Kitlog Pro v2.0

Rons Web Site
' style=
Date:  6-13-2006
Number of Hours:  6.00
Manual Reference:  
Brief Description:  Installed vent lines and cap fuel wiring

Installed the Vent and FI return lines. Also installed the flop tubes. Installed the Capactitance fuel sending connector. Everything is prosealed, should not leak.
' style=

Getting ready to solder the wire to the connector.

Getting ready to solder the wire to the connector.

' style=

sending wire, fuel fittings and flop tubes

sending wire, fuel fittings and flop tubes

' style=

vent lines

vent lines

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.