Powered By Kitlog Pro v2.0
Ron Lendon's Aircraft Mfg.
CZAW CH601XL
Empennage
12-26-2009
< Previous Log Entry
Next Log Entry >
Date:
12-26-2009
Number of Hours:
2.00
Manual Reference:
Brief Description:
Installed elevator stops and cleaned up hangar
The elevator stops are set at 14.4 degrees. The plans call for 12 to 15 degrees. Took about 10 degrees out of the down elevator travel.
Put all loose parts in bags and put all the parts up on the shelves.
Checking elevator deflection
Elevator Stops
Parts on shelves
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
CZAW CH601XL Home
All
Empennage
Fuselage
Miscellaneous
Tools
Wings
Light Sport Recumbent Bike Home
Zodiac CH 601 XL Home
Copyright © 2001-2013 Matronics. All Rights Reserved.