Powered By Kitlog Pro v2.0
Ron Lendon's Aircraft Mfg.
CZAW CH601XL
All
1-13-2010
< Previous Log Entry
Next Log Entry >
Date:
1-13-2010
Number of Hours:
2.50
Manual Reference:
6-ZU-2
Brief Description:
Position and drill doublers on rear center spar we
Clean surface, layout center lines, positio and clamp parts.
Build up a wooden riser so I can clamp and work the parts better.
Using a pilot bushing to align 3/32 drill to the center of the exsisting holes in the web, spot face.
Remove the bushing and drill through. Did all A5 holes then used rivets to align the spar caps back in place.
Transfer punch centers and drill pilot holes using the drill press.
Re attach spar caps and open the 1/4 holes one drill size under and reamed them to final size.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
CZAW CH601XL Home
Category
# Logs
# Hours
All
71
2527
Empennage
2
225
Fuselage
12
1137
Miscellaneous
12
-74
Tools
1
185
Wings
44
1054
Light Sport Recumbent Bike Home
Zodiac CH 601 XL Home
Copyright © 2001-2024 Matronics. All Rights Reserved.