Brief Description: Grind weld on inner, layout and cut outer forks
Cleaned up the inner welds, made 3/4" spacers for the inside.
Set 8" long bolt across vee blocks to set the axel groove on. Rotated the forks paralell to 90 degree plate and used a surface (scratch) gage to layout the lines. Moved the lines up 2" above the start of the full diameter with 1 1/2" between lines. Marked both fork ends to know where they came from.