KitLog pro

Powered By Kitlog Pro v2.0

Ron Lendon's Aircraft Mfg.
' style=
Date:  12-27-2007
Number of Hours:  3.50
Manual Reference:  
Brief Description:  Prep on Slip Pipe for Pedal Crank.

Shaped the tube end to accomadate the pedal crank. Positioned and tack welded to the slip pipe.
' style=

Checking the depth

Checking the depth

' style=

Clamped for tack welding.

Clamped for tack welding.

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.