Brief Description: Getting ready to close the leading edge
Waiting on fittings, proseal and tools to arrive. Tonight placed the 4509 landing and taxi lights in their fixtures. Riveted the wing locker rear panel. Removed clecoes from top wing skin to give access to the plumbing and wire routes.