KitLog pro

Powered By Kitlog Pro v2.0

Ron Lendon's Aircraft Mfg.
' style=
Date:  11-29-2006
Number of Hours:  1.10
Manual Reference:  6W4
Brief Description:  Rivet Center Spar 3 of 4

Image 1) This is the process, position rivet head on lower anvil and compress. Hit top fo arbor press 5 times smartly with rawhide BFH.

Image 2) Here you can see the rubber cushion holding the metals down to the rivet head.

Image 3) Center Spar Assembled.
' style=

The riveting machine

The riveting machine

' style=

cushion clamps parts

cushion clamps parts

' style=

Center Spar Assembled

Center Spar Assembled

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.