KitLog pro

Powered By Kitlog Pro v2.0

Ron Lendon's Aircraft Mfg.
' style=
Date:  5-19-2012
Number of Hours:  5.00
Manual Reference:  
Brief Description:  Beging making cables for the controls

Bolted the flap control.

Setup the big table for making the cables.

Have the rudder cables made. Need to attach a couple of extra fairleads below where the Dynon magnometer is located.
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.