KitLog pro

Powered By Kitlog Pro v2.0

Ron Lendon's Aircraft Mfg.
' style=
Date:  5-1-2012
Number of Hours:  3.00
Manual Reference:  
Brief Description:  Stabilizer and rudder

Re checked the line up with the laser from the front. Started with the fuselage, level, sited rudder, perpendicular, stabilizer, level.

Made up the stops for the elevator.

Trimmed rudder skin to clear the elevator horn.

Glued the gutter guard back in place to hold the brake line. It got removed during the unload.
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.