KitLog pro

Powered By Kitlog Pro v2.0

Ron Lendon's Aircraft Mfg.
' style=
Date:  3-29-2012
Number of Hours:  2.00
Manual Reference:  
Brief Description:  Canopy fitting phase 1

The directions say to fit the seal front and back. This canopy is a little thicher so the seal wants to release from the edge.

Tried cross taping and that didn't work.

After wiping the seal with a little thinner on a rag and taping lengthwise works. Also placed visqueen under the seal so the unit can be easily moved into position.

Room temp is 70+ degrees and the canopy settles right into place.
' style=





' style=

Cross taping

Cross taping

' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.