KitLog pro

Powered By Kitlog Pro v2.0

Ron Lendon's Aircraft Mfg.
' style=
Date:  9-6-2011
Number of Hours:  2.50
Manual Reference:  
Brief Description:  Heat muff mock up

Trimmed ends of the aluminum heat box mock up and riveted it in place. Should use thin stainless for the final.

Per WW the clearance for engine movement is less than 3/8 with the corvair. He did recommend 1/2 around the heat muff though.

Positioned the cabin heat box on the left side to keep it away from the fuel system.
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.