Powered By Kitlog Pro v2.0
Bob Leffler's RV-10
RV-10
All
2-1-2008
< Previous Log Entry
Next Log Entry >
Date:
2-1-2008
Number of Hours:
4.00
Manual Reference:
Brief Description:
Parts inventory
Started the inventory process.
I brought all the parts bags in the house and coverted our kitchen table to a huge parts big. Once I counted all the parts, I stored them in plastic parts bins. This was almost as much fun as deburring parts.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-10 Home
All
Ailerons
Avionics
Brakes
Cabin Cover
Control System
Diversions
Doors
Electrical
Elevator
Empennage
Engine
Final Assembly
Finish Kit
Firewall Forward
Flaps
Fuel System
Fuel Tanks
Fuselage
Horizontal Stab
Interior
Lighting
Milestones
Miscellaneous
Paint
Panel
Prep
Prop
Rudder
Shop
Tailcone
Tools
Vertical Stabilizer
Wing Leading Edge
Wings
Wings
Copyright © 2001-2013 Matronics. All Rights Reserved.