Powered By Kitlog Pro v2.0
Ron Web Site
RV-8
Empennage
1-18-2018
< Previous Log Entry
Next Log Entry >
Date:
1-18-2018
Number of Hours:
3.00
Manual Reference:
NA
Brief Description:
Empennage Kit Inventory
I purchased the empennage kit from Kevin Trayer in Texas. The kit was inventoried against the original Van’s Aircraft packing list which was included with the kit. All components were verified and the kit is complete.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-8 Home
Category
# Logs
# Hours
All
305
968
Electrical
2
38
Elevators
32
67
Empennage
8
20
Fuselage
62
225
Horizontal Stabilize
24
45
Rudder
22
33
Tools
1
2
Vertical Stabilizer
8
13
Wings
146
525
Copyright © 2001-2021 Matronics. All Rights Reserved.