Powered By Kitlog Pro v2.0
Ron Web Site
RV-8
All
4-21-2020
< Previous Log Entry
Next Log Entry >
Date:
4-21-2020
Number of Hours:
2.50
Manual Reference:
8-25
Brief Description:
Drilling F-804N-1 Bulkhead Caps
Today I finished the final steps that were not completed during QB fuselage assembly. I match drilled the holes in the F-804N-1 bulkhead caps to the bulkheads. I then deburred all the holes.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-8 Home
Category
# Logs
# Hours
All
277
828
Elevators
32
67
Empennage
8
20
Fuselage
36
123
Horizontal Stabilize
24
45
Rudder
22
33
Tools
1
2
Vertical Stabilizer
8
13
Wings
146
525
Copyright © 2001-2020 Matronics. All Rights Reserved.