KitLog pro

Powered By Kitlog Pro v2.0

Ron Web Site
' style=
Date:  4-17-2018
Number of Hours:  3.50
Manual Reference:  Emp 6-3 to 6-5
Brief Description:  Dimpling Horizontal Stabilizer skin, Drilling Vert

Tonight I finished dimpling the horizontal stabilizer skins with the C-frame dimpler. I had some trouble with the dies sticking but hit the male side briefly with a scotchbrite wheel and it fixed the problem.

I also began drilling the vertical stabilizer. I clecoed the VS hinge brackets to the VS-803PP and VS-808PP doubler and then drilled the missing holes. I then prepared the VS-704, -705, -706 and -707 ribs by fluting and straightening the ones that needed it. I clecoed the ribs to the front and rear spars and then drilled all the required holes to #30. I clecoed on the VS-801PP skin and that was it for the night!
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.