KitLog pro

Powered By Kitlog Pro v2.0

Michaels Sonex #145 log
' style=
Date:  11-2-2014
Number of Hours:  0.30
Manual Reference:  P30
Brief Description:  Installing the oil cooler assembly

I installed the oil cooler & baffle assembly today. Re-installed the cowling afterwards to make sure it still fits and take a picture.
the cowl does go on a little more difficult now with the baffles/rubber seals pressing against it but I'm sure that will get easier in time.
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.