Finished assembly of the wing root fairings. Installed and verified rigging of the ailerons. Mounted and adjusted the flaps. Had to trim the inboard edge of each flap. Installed elevator stops. Installed and adjusted the magnetometer. Adjusted and installed the brake line from the fuselage to the brake assembly. Probably did a couple other tasks that slip my mind.