KitLog pro

Powered By Kitlog Pro v2.0

Rick's Web Site
' style=
Date:  10-8-2020
Number of Hours:  4.50
Manual Reference:  
Brief Description:  Cowl

I sanded the foam blocks along the bottom right intake to match the higher baffle ramp due to the a/c compressor. After achieving an acceptable shape I used spackle putty to further shape and fill the modification.

Began installation of the oil cooler doors. Using Hartwell latches and a hidden hinge which both required modification beyond the normal plans.
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.