KitLog pro

Powered By Kitlog Pro v2.0

Rick's Web Site
< Previous Log Entry          Next Log Entry >
' style=
Date:  6-25-2020
Number of Hours:  19.00
Manual Reference:  46-4 through 7
Brief Description:  Install Landing Gear

Another big day. Installed the main and nose landing gears to include installing the wheel and brake systems for the main gear and the nose gear suspension. Overall everything went very well. It was another case where the build up, especially for the nose gear suspension, was way over blown. On to the engine install tomorrow.
' style=





' style=




' style=




' style=
< Previous Log Entry          Next Log Entry >










Copyright © 2001-2024 Matronics. All Rights Reserved.