KitLog pro

Powered By Kitlog Pro v2.0

Rick's Web Site
' style=
Date:  5-18-2020
Number of Hours:  5.20
Manual Reference:  
Brief Description:  Install Air Conditioing

Finalized the location of the evaporator on the equipment shelf. Drilled the eight bracket attachment holes for the evaporator. Also drilled the two rear brackets to the evaporator assembly. Located and drilled the mounting hole for the a/c dryer assembly.
' style=





' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.