KitLog pro

Powered By Kitlog Pro v2.0

Rick's Web Site
' style=
Date:  5-24-2020
Number of Hours:  10.70
Manual Reference:  
Brief Description:  Fuselage Tasks

1. Sanded down the first filling of the cabin top A pillar and edge around the top console. After getting a good shape, I applied a coat of micro along the above mentioned areas and around the entire inside door perimeter, back windows and upper section of the cabin to aft of the door opening but forward of the area which will have the fabric headliner.

2. Finished installing the trottle quadrant. after the height and fore/aft adjustments were finalized drilled and inserted #3 rivets to lock the quadrant in place.

3. Filled and sanded the carbon internal pieces such as the quadrant and instrument panel for future priming.
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.