Installed the last four screws to the equipment trays.
Continued fit and installation of the carbon instrument panel and sub-panel components. Fit is very good and requires only minor trimming. The top of the sub-panel doesn't have much material to install the three #6 screw nut plates. I ended up installing an aluminum backing plate which solved that problem. Not quite sure why they trim that area so close.