Brief Description: Fuel System, Rudder Pedals and Control Rod
Made the move of the fuselage from on top of work benches to the recently fabricated fuselage stand. Had a number of extra hands to make the move.
Finished the fuselage installation of the fuel boost pump, filter and associated fuel lines.
Continued installation of the Control Approach rudder pedals. The system easily mounted to the fuselage. Since the pedal control arms are inside the tunnel, I modified the tunnel cover to accomodate the arms. Plagerisim is a good thing.