KitLog pro

Powered By Kitlog Pro v2.0

Rick's Web Site
' style=
Date:  10-18-2019
Number of Hours:  3.80
Manual Reference:  34-5 to 7 & 35-2
Brief Description:  Baggage Door & Cover, Foot Well Floor

I mounted the baggage door to the fuselage. I'll finish up the door after I recieve the door lock from Vans. Installed the left side wall cover. Began installation of the passenger foot well floors...tight fit.
' style=





' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.