KitLog pro

Powered By Kitlog Pro v2.0

Rick's Web Site
' style=
Date:  12-28-2020
Number of Hours:  2.50
Manual Reference:  12-5
Brief Description:  Empennage Fairing

Finished drilling on the empenage fairing. Trimmed and sanded the fairing edges. Applied a coat of micro to the mating surfaces to get a tight fit along the fuselage, vertical and horizontal stab surfaces.
' style=





' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.