KitLog pro

Powered By Kitlog Pro v2.0

Rick's Web Site
' style=
Date:  5-22-2020
Number of Hours:  11.80
Manual Reference:  
Brief Description:  Fuselage Tasks

1. The first fuselage task was to assemble and fiberglass the fresh air vent Y duct.

2. The second task was to fill the A pillars with expandable foam. I then cut and sanded the desired shape which will cover the two conduits. Also sanded much of the glue and filler used to attach the top overhead console. Lastly, applied a Cabo/micro mix on to of the shaped foam on the A pillars.
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.