1. The first fuselage task was to assemble and fiberglass the fresh air vent Y duct.
2. The second task was to fill the A pillars with expandable foam. I then cut and sanded the desired shape which will cover the two conduits. Also sanded much of the glue and filler used to attach the top overhead console. Lastly, applied a Cabo/micro mix on to of the shaped foam on the A pillars.