KitLog pro

Powered By Kitlog Pro v2.0

Rick's Web Site
' style=
Date:  5-10-2020
Number of Hours:  1.70
Manual Reference:  
Brief Description:  Install Air Conditioning

I jumped back to work on the a/c. The Aussie configuration requires two supply and two return vents in the upper baggage bulkhead. I decided to fabricate a new aluminum bulkhead that is flat. The vents protrusion will be much cleaner. Ultimately, I'll fabricate an upholsetered overlay for the bulkhead to provide a much more finished look. Today, I made a cardboard mock up of the new bulkhead cover.
' style=





' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.