I cut out the center three instrument panel pieces. I clamped the panel to the sub panel. Afterwards, I drilled and countersunk eight attachment holes. Following that I installed eight #8 nutplates to the sub panel. Lastly, I cleaned and prepped all pieces, to include the equipment floor pieces for priming. It should be warm enough tomorrow to prime.