KitLog pro

Powered By Kitlog Pro v2.0

Rick's Web Site
' style=
Date:  7-29-2019
Number of Hours:  1.20
Manual Reference:  28-13
Brief Description:  Assemble Forward and Mid Fuselage Assemblies

Back from the big show. Began assembly of the front and mid fuselage sections. I riveted the forward fuselage ribs to the forward main spar bulkhead. Made initial assembly of the two sections.

While I was gone, I received the inside heat duct flanges from Vans. I primed, drilled and riveted the inside flanges. The bolted the two heat valves to the firewall.
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.