Powered By Kitlog Pro v2.0
Rick's Web Site
RV-10
All
10-26-2018
< Previous Log Entry
Next Log Entry >
Date:
10-26-2018
Number of Hours:
4.50
Manual Reference:
18-3 & 4
Brief Description:
Assemble Left Fuel Tank
Continued assembly of the left fuel tank. Deburred, fit and final drilled the remaining root rib, root tank attach bracket, root and auxillary fuel flanges, Z brackets and rear baffle.
Z brackets
Root tank attach bracket
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-10 Home
Category
# Logs
# Hours
All
368
1232
Air Conditioning
4
8
Empennage
73
159
Fuselage
152
524
Miscellaneous
1
Wings
138
541
Copyright © 2001-2019 Matronics. All Rights Reserved.