Next you back drill up from the bottom of the Deck through the Rollbar. Used an angle drill for this. remember that the front and rear bolts are different size. Front: AN3-6A Rear: AN4-6A
Back drilled undersize.
Opened holes
You can see the spacers from the bottom of the Aft deck.