KitLog pro

Powered By Kitlog Pro v2.0

"THE OTHER WOMAN"
' style=
Date:  7-10-2005
Number of Hours:  1.75
Manual Reference:  8-17
Brief Description:  Vertical stabilizer mounting

Ok, it's time to drill all the holes and mount the Vertical stab. Got it all in place, made sure everything was linned up again in all locations. Double and triple checked everything. Drilled all the holes in the Front spar to the F-781 using the prepunched holes. Then drilled the holes in the bottom of rear spar to the F-712 bulkhead.
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.