KitLog pro

Powered By Kitlog Pro v2.0

Ralph Finch RV-9A Build
' style=
Date:  10-26-2014
Number of Hours:  8.00
Manual Reference:  
Brief Description:  Another makeup entry

Attached ANL fuse blocks to firewall with nutplates for primary alternator to battery contactor wire (60 amps) and standby alternator to battery (20 amps). Installed alternator to ANL wire and ANL to contactor/battery wire for both alternators. Crimped and installed final coil wires. Routed starter wire, not attached yet.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.