Drilled the stiffeners to the tank skin. Drilled the inboard T712 and installed nutplates to the spar. Fit the tank skin to the baffle and spar, everything looks good! Attached ribs to the baffle in preperation for drilling. *Need to drill ribs to the spar and attachments*