|
|
ROBERT'S WEB SITE
|
Date: 7-26-2008
|
Number of Hours: 3.00
|
Manual Reference:
|
Brief Description: opening up holes in HS
|
|
cleaned up the work bench. 4 ribs were previously completed with Zinc Oxide, along with the rear attachment shim and plate.
re-assembled entire skeleton, opened up holes to A5 size. The only A4 sized holes are the 2 on each end of each spar, the two center holes of each rib, and all four holes of rib #1 and #6 (the two outboard ribs).
Disassembled skeleton. Will need to deburr, alumiprep, alodine, zinc oxide the two spars, 4 doublers, 2 ribs, and the front attachments.
|
|
|
|
|
|
|
|
|
Copyright © 2001-2024 Matronics. All Rights Reserved. |