KitLog pro

Powered By Kitlog Pro v2.0

ROBERT'S WEB SITE
' style=
Date:  7-26-2008
Number of Hours:  3.00
Manual Reference:  
Brief Description:  opening up holes in HS

cleaned up the work bench. 4 ribs were previously completed with Zinc Oxide, along with the rear attachment shim and plate.

re-assembled entire skeleton, opened up holes to A5 size. The only A4 sized holes are the 2 on each end of each spar, the two center holes of each rib, and all four holes of rib #1 and #6 (the two outboard ribs).

Disassembled skeleton. Will need to deburr, alumiprep, alodine, zinc oxide the two spars, 4 doublers, 2 ribs, and the front attachments.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.