Installed the canopy locks. Worked the frame a little more trying to get just the right spacing between the roll bar and frame. Blew out the tracks, they get burrs in the bearings when drilling.Drilled the capture strip. Had to open up the the hole on the lower and middle strip to get it all to lay down over the weld for the handle. Taped and clamped the windshield in place then drilled to 40 and clecoed.