Drilled aft spar to 30,11 and .25 where required then removed and deburred, edge polished and primed. Clecoed spar to frame then riveted. Found four rib reinforcement angles that I had left out. Clamped angles and transfer driled to 40 then 30. Removed,deburred,primed then riveted in place.