Brief Description: Nav wiring and pitot and fuel line
Drilled and installed gromets in the trailing edge of the ribs then ran two #18 wires for the lights. Installed two clamps for the wires and added a ground wire to one of the clamp screws. Installed fuel line, clamped in two places per manual. Installed pitot/static tube. Installed lines and clecoed in place.