KitLog pro

Powered By Kitlog Pro v2.0

RANDY'S WEB SITE
' style=
Date:  8-21-2010
Number of Hours:  5.00
Manual Reference:  
Brief Description:  Brackets, downspring flap lever and baggage floor

I didn't like the the way the cabin heat control was working so I made a new bracket that would allow a larger radius turn on the control. I'm happy with the way it works now. Removed the flap bracket and drilled for the downspring installation. Reinstalled the marked the forward push tube per the manual and installed downspring. Ran the control wire for the ELT that I had forgotten to run. Cleaned baggage aera and checked to see if it was ready to close up. Riveted baggage compartment floor in place. Installed flap lever.
' style=

Cabin heat control bracket

Cabin heat control bracket

' style=

Flap lever and baggage floor installed

Flap lever and baggage floor installed

' style=

Downspring

Downspring

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.