Powered By Kitlog Pro v2.0
RANDY'S WEB SITE
S-19
HorizontalStabilizer
2-26-2011
< Previous Log Entry
Next Log Entry >
Date:
2-26-2011
Number of Hours:
8.00
Manual Reference:
Brief Description:
Balanced and mounted stab
I built the form up for the balance weight then melted 8 lbs of lead and poured into the form. Installed balance tube and balanced stab. Installed stab
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
S-19 Home
Category
# Logs
# Hours
All
408
1515
Aft Fuselage
2
9
Aft fuselage
21
108
Avionics
34
138
Canopy
16
72
Center Fuselage
32
130
Construction Tips
6
Cowling
5
21
Empennage
1
1
Engine
31
90
Fuel tanks
9
24
Fuselage
43
172
Fuselage
32
130
FWD Fuselage
27
102
HorizontalStabilizer
15
68
Inspections
2
9
Instrument Panel
1
Interior
2
8
Miscellaneous
4
4
Painting
5
6
Phase I flight test
16
22
Rudder
6
18
Vertical Stabilizer
10
28
Wheel Pants
2
23
Wings
85
326
Workshop
1
6
Copyright © 2001-2024 Matronics. All Rights Reserved.