Brief Description: Deburr rt flap start on left flap
Took apart the right flap frame and deburred and polished edges. Modified flap horn, layed out hinge and marked hole spacing. Drilled left flap hinge. Clecoed left flap frame together. Clamped flap hinge to spar using a piece of hinge as a spacer to locate hing in proper position. Drilled every other hole to 40.