Took apart the left aileron frame and deburred. Gathered the flap parts. Cut hinge to size and drilled per manual. Clecoed frame together and built a jig to drill the hinge to the spar. Drilled hinge to 40 then 30. Drilled ribs and brackets to 40 then 30.