Powered By Kitlog Pro v2.0
RANDY'S WEB SITE
S-19
All
4-27-2009
< Previous Log Entry
Next Log Entry >
Date:
4-27-2009
Number of Hours:
1.00
Manual Reference:
Brief Description:
Dirlled holes and primed
Drilled the four holes in the weldments that I missed. Deburred and bead blasted steel parts then primed and painted.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
S-19 Home
All
Aft fuselage
Aft Fuselage
Avionics
Canopy
Center Fuselage
Construction Tips
Cowling
Empennage
Engine
Fuel tanks
Fuselage
Fuselage
FWD Fuselage
HorizontalStabilizer
Inspections
Instrument Panel
Interior
Miscellaneous
Painting
Phase I flight test
Rudder
Vertical Stabilizer
Wheel Pants
Wings
Workshop
Copyright © 2001-2013 Matronics. All Rights Reserved.