KitLog pro

Powered By Kitlog Pro v2.0

RANDY'S WEB SITE
' style=
Date:  3-20-2009
Number of Hours:  7.00
Manual Reference:  
Brief Description:  Paint, rudder pedals,sub panel

Sandblasted primed and painted rudder pedals,torque tubes and control stick torque tube. Riveted nutplates on floorboard and panel frame. Riveted floorboard to floor chanels. Reamed rudder pedal torque tube pillars to final size. Relieved one pillar due to interference with one of the torque tubes. Installed rudder pedal torque tubes, rudder pedals and brakes. Riveted sub panel to panel frame and re installed switches.
' style=

Pedals,Brakes

Pedals,Brakes

' style=

Floor

Floor

' style=

Sub panel with switches

Sub panel with switches

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.