Powered By Kitlog Pro v2.0
RANDY'S WEB SITE
S-19
All
6-15-2008
< Previous Log Entry
Next Log Entry >
Date:
6-15-2008
Number of Hours:
3.50
Manual Reference:
Brief Description:
VS Skinning And Jiging
Deburred frame and riveted together. Drilled to 30 aft side of both rear skins. Took apart and deburred. Installed jigs and measured for square. Drew center lines on ribs. Ready to transfer drill skins after stiffeners are installed.
Drilled to 30 aft side of R skin
Left skin
Frame in jig ready to drill skins
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
S-19 Home
Category
# Logs
# Hours
All
408
1515
Aft fuselage
21
108
Aft Fuselage
2
9
Avionics
34
138
Canopy
16
72
Center Fuselage
32
130
Construction Tips
6
Cowling
5
21
Empennage
1
1
Engine
31
90
Fuel tanks
9
24
Fuselage
32
130
Fuselage
43
172
FWD Fuselage
27
102
HorizontalStabilizer
15
68
Inspections
2
9
Instrument Panel
1
Interior
2
8
Miscellaneous
4
4
Painting
5
6
Phase I flight test
16
22
Rudder
6
18
Vertical Stabilizer
10
28
Wheel Pants
2
23
Wings
85
326
Workshop
1
6
Copyright © 2001-2024 Matronics. All Rights Reserved.