Powered By Kitlog Pro v2.0
RANDY'S WEB SITE
S-19
All
6-14-2008
< Previous Log Entry
Next Log Entry >
Date:
6-14-2008
Number of Hours:
5.00
Manual Reference:
Brief Description:
Started VS
Started the Vertical stab today. Built the front spar then the aft spar,took apart and deburred and primed. Then reassembled and revited where directed and clecoed the rest.
Front Spar
Deburring
Primed frame
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
S-19 Home
All
Aft fuselage
Aft Fuselage
Avionics
Canopy
Center Fuselage
Construction Tips
Cowling
Empennage
Engine
Fuel tanks
Fuselage
Fuselage
FWD Fuselage
HorizontalStabilizer
Inspections
Instrument Panel
Interior
Miscellaneous
Painting
Phase I flight test
Rudder
Vertical Stabilizer
Wheel Pants
Wings
Workshop
Copyright © 2001-2013 Matronics. All Rights Reserved.