Powered By Kitlog Pro v2.0
RANDY'S WEB SITE
S-19
All
12-25-2010
< Previous Log Entry
Next Log Entry >
Date:
12-25-2010
Number of Hours:
2.50
Manual Reference:
Brief Description:
Right fuel tank
Installed fuel drain and supply bushing to right fuel tank. installed and sealed sending unit. Connected fixed fuel line. Pressure tested tank with air and checked with soap. Riveted bottom skin in place.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
S-19 Home
Category
# Logs
# Hours
All
408
1515
Aft fuselage
21
108
Aft Fuselage
2
9
Avionics
34
138
Canopy
16
72
Center Fuselage
32
130
Construction Tips
6
Cowling
5
21
Empennage
1
1
Engine
31
90
Fuel tanks
9
24
Fuselage
32
130
Fuselage
43
172
FWD Fuselage
27
102
HorizontalStabilizer
15
68
Inspections
2
9
Instrument Panel
1
Interior
2
8
Miscellaneous
4
4
Painting
5
6
Phase I flight test
16
22
Rudder
6
18
Vertical Stabilizer
10
28
Wheel Pants
2
23
Wings
85
326
Workshop
1
6
Copyright © 2001-2024 Matronics. All Rights Reserved.